2023/08/10 9:20. Delportan sewage truck dump site. Same as previously from this angle. Doesn't appear as if there has been any change here. No change to the office structure. There has been an attempt to raise the area at the back of the manhole, but this potentially has created a problem as the rocks can fall into the manhole and cause a blockage. No real other changes here so far. The change at the manhole seems to have reduced the spillages and so the waste going down to the Blougat. Manholes not overflowing, good sign.
Posts
Showing posts from August 6, 2023