  2024/09/27 08:50. Tweelopies at the N14.  Mine impacted water.  Visually appearance and volume staying consistent.
Image
2024/09/17. 10:20. Riet Spruit at Malmani Road.  Slight discolouration and volume staying consistent.  No smell.  Sample 3.
Image
2024/09/06 09:20. Mine impacted water, seems to be a slight increase in volume, water is clear but acidic.  At least there is a warning sign here now. Just before it goes under the R24 to the Krugersdorp game reserve.
Image
  2024/08/07 09:10. AMD.  Tweelopies at N14.  The water is clear.  Can see that the bridge over the water has been removed.  Weir is still there.
Image
 2024/07/30. 10:35. Riet Spruit at Malmani Road.  Quite clear and volume staying consistent.  Sample point 3.
Image
  AMD 2024/06/25 09:20. Outflow from the wetlands before crossing the R24 and into the Krugersdorp game reserve. The outflow staying consistent.  Water tint staying consistent - slight brownish tint.  So no changes here. Can see buildup of chemicals on pipe over time from splashing water.
Image
 AMD 2023/09/12  9:50 The outflow staying consistent.  Water tint staying consistent - slight brownish tint.
Image
  AMD 2023/08/23  9:10 The outflow staying consistent.  Water tint staying consistent - slight brownish tint.
Image
AMD 2023/08/15  9:10 The outflow still slightly increased compared to a year ago.  Interesting algae growth taking place on slow moving water.  
  2023/07/27   15:56  At the confluence of the Blougat (sewage pollution) and the Riet (acid mine water).  One can see the Blougat with its high level of discolouration mixing with the relatively clear water from the Riet before carrying on downstream.  This point is within the core of the Cradle.
Image
 AMD 2023/07/18  09h24 The outflow is slowing reducing but still increased compared to a year ago.
Image
  AMD 2023/06/20 9:15 There is still an substantial amount of water flowing out of the AMD wetlands, the original channel is the volume there always has been 1st pic, the 2nd pic shows the additional flow although less than earlier this year.
Image
  2023/05/02. 09h50 AMD The Tweelopies flow before going under the N14.  The volume is higher than last year due to the increased amount of AMD being pumped and processed.
Image
 AMD 2023/04/12 9h15 There is still an substantial amount of water flowing out of the AMD wetlands, although there is a reduction in the first channel the combined amount of the three channels is still higher than was present last year with only a single channel. Redish precipitation taking place on the bed of the newer outflows. New outflows since the beginning of this year has consistently high volume of water. Original channel - water flow slightly reduced. This is the old channel with a diminished outflow today.
  AMD 2023/02/23 9h25 There is still an substantial amount of water flowing out of the AMD wetlands.
Image
AMD 2023/02/17 9h20 There is still an substantial amount of water flowing out of the AMD wetlands. Brown scum collecting on the water before going under the R24.
Image
  AMD 2023/02/07 9h24 There is still an substantial amount of water flowing out of the AMD wetlands.  The top photo is the normal outflow and the 2nd is the additional.
Image
Access road to AMD outflow from wetlands. Original pipe in background and new pipes in the front. Additional outflow. Original outflow. Original outflow. Sediment taken place Sediment taken place.  AMD 2023/01/18 9h22 There is still a substantial amount of water flowing out of the AMD wetlands.  Some earth works have been done and looks like at least two additional large diameter steel pipes have been laid to cope with the volume.  In the pics I tried to show the additional pipes and outflow from the wetlands as well as the original flow.  The last pics show the reddish sediment that has taken place.
Image
 AMD 2023/01/09 15h10 Substantial amount of water flowing out of the AMD wetlands.  Access roads flooded.  Normally all the flow is in the one concrete pipe.  Guess the excessive decanting is ongoing due to the heavy rains. Without an water analysis one would know what the water is actually like. There was an e-mail from the responsible person at DWS confirming that the Western Basin decanting is ongoing and that the treatment plant is working above capacity to minimise the impact.  They are expecting the decanting to continue.
AMD 2022/12/19 20h20 Regarding the increased AMD flow shown last week Thursday apparently there are some issues being experienced by the Trans-Caledon Tunnel Authority (TCTA) at the Western Basin Treatment plant due to the high levels of rainfall which have resulted in some additional decanting taking place.  I'm attaching their media release from the 13th December which goes into more detail. Please note the warning in the document:  "All residents and communities residing along the Tweelopies River are urged to avoid using the water in the interlinked streams, rivers and dams, until further notice." Western Basin AMD Plant Media Release