2024/10/15. 08:45. Brickvale, Tarlton. Still not operational. Electricity seems to be in. Sewage dam is lower due to blockage in trench being removed. Lots of gassing and a strong smell. The sewage is flowing straight to the large pit next to the N14.
2024/09/06. 09:55. Munsieville ext4 sewage pump station. (top right) Manhole that sometimes overflows into the intersection, can see it has recently. Not much working here. Overflowing manhole across the road from the pump station. Area behind pump station, sewage come out of back of residences. The structure that was here has been removed. Floor is still flooded. Sewage bubbling out of pipe at the back of a toilet. Sewage should be flowing in the other direction. Down the road on its way to the Blougat and the Cradle. Smell is back.
Comments
Post a Comment